Preview draft · back to approval hub

Draft for Mark’s approval — not published.

Homepage SEO / content implementation draft

A clearer homepage route for Cumbria energy enquiries.

This is a proposed homepage change set for Mark’s approval. The live homepage has not been changed. Every claim, number, image and link below remains a working draft.

Permanent working draft only — not published and not added to live navigation.

Proposed SEO metadata

One clear promise in search.

SEO title — exact proposed text

Solar, Battery & EV Installers in Cumbria | Thomson Electrical & Energy Solutions Ltd

Keep the description practical: solar PV, battery storage, EV charging and electrical services across Cumbria, with a clear route to a free assessment or quote. Mark must approve the final wording before any live edit.

Proposed trust block

Use proof carefully, with official labels.

Proposed visible trust HTML: “MCS accreditation, RECC, NICEIC APPROVED CONTRACTOR and TrustMark.” Keep the official Thomson suite and these labels only; do not add invented awards or unsupported badges.

100+ Complete Installations

PENDING MARK ACCURACY APPROVAL BEFORE LIVE USE

400+ 5-Star Reviews

PENDING MARK ACCURACY APPROVAL BEFORE LIVE USE

MCS · RECC

Official accreditation labels

NICEIC APPROVED CONTRACTOR

Alongside TrustMark

Official Thomson Electrical & Energy Solutions Ltd accreditation suite showing MCS, RECC, NICEIC APPROVED CONTRACTOR and TrustMark

Proposed image and alt-text plan

Show genuine work, described plainly.

Use only actual Thomson installation or library assets. These are suggested factual descriptions; Mark should confirm each image and caption before live use.

A professionally installed Sigenergy battery storage unit mounted on a wall with labelled isolators and Thomson Electrical & Energy Solutions Ltd identification stickers
Battery image / proposed alt text shown above. Use as genuine Thomson Electrical & Energy Solutions Ltd installation evidence.
A Thomson Electrical & Energy Solutions Ltd team member securing solar panels to a rural farm workshop roof with scaffolding visible
Solar image / proposed alt text shown above. The supplied image shows a rural farm workshop installation.
Genuine Thomson EV installation and customer-review evidence image, shown without transcribing review text
EV evidence image / proposed alt text shown above. Do not transcribe unverified review text.

The supplied branded van image is a colour and badge reference only. It is not proposed as a website asset.

Proposed copy cleanup

Group the offer once, then make the next step obvious.

Remove repetition

Remove repeated Solar Panels and Battery Storage blocks. Present solar PV, battery storage, EV charging and electrical services once each, with one clear explanation and one destination.

Make it readable

Use short paragraphs, descriptive headings and British English. Keep advice simple, local and honest; remove duplicate claims and any copy that sounds like a guarantee.

These CTAs use existing routes only. Existing forms submit through the working site handler /api/sendEmail; this draft does not invent a new endpoint.

Why Thomson

Keep trust signals accurate and easy to check.

The live homepage should use the supplied official Thomson suite and only the approved accreditation labels. Figures remain draft claims until Mark confirms them.

NICEIC APPROVED CONTRACTOR alongside MCS accreditation.

Official Thomson Electrical & Energy Solutions Ltd accreditation suite: NICEIC APPROVED CONTRACTOR, MCS, RECC and TrustMark

400+ 5-Star Reviews

PENDING MARK ACCURACY APPROVAL BEFORE LIVE USE

100+ Complete Installations

PENDING MARK ACCURACY APPROVAL BEFORE LIVE USE

MCS

accreditation where relevant

RECC · TrustMark

with NICEIC APPROVED CONTRACTOR

Change log

What would change later.

  1. 01. Replace the live homepage SEO title and description with the approved metadata.
  2. 02. Restructure repeated service blocks into one solar, battery, EV and electrical route each.
  3. 03. Add approved trust wording, confirmed figures, genuine images and factual alt text.
  4. 04. Add the approved CTA destinations while retaining the working enquiry forms and handler.
  5. 05. Run link, accessibility, sitemap, canonical and indexation checks after any production edit.